BREAKING NEWS

10-16-2026     3 رجب 1440

Ease of Doing Business Act: Growth Without Compromise-11

Let Ease of Doing Business not become Ease of Undoing Planning. Therefore, what is required is that simplifying procedures should not shirk safeguards; accelerated investments should not engender ecological destruction. J&K is a place where every plot is part of a larger urban and ecological system, the true measure of reform or enactments is not how fast we build, but how wisely we shape. A building may rise on a single plot but its consequences are witnessed by the entire area/community.

October 16, 2026 | Hammid Ahmad Wani

Building Bye-Laws, FAR and Development Control: Flexibility Has Limits

The Provisions of the Act indicate that it permits relaxation of Development Control Norms, including FAR, height, ground coverage, setbacks, parking and open space, through the prescribed mechanism. These controls are sometimes seen as rigid technical restrictions. In reality, they influence how a building relates to its surroundings and how much pressure it places on public infrastructure. An increase in FAR may be appropriate near a well-served public transport corridor with adequate water supply, sewerage and emergency access. The same increase may be unsuitable in a congested neighbourhood with narrow roads, inadequate drainage and limited open space. Similarly, reducing setbacks or increasing ground coverage may appear to be a small adjustment for one building. If repeated across a neighbourhood, however, such changes can reduce ventilation, daylight, permeable surfaces and emergency access. The Jammu and Kashmir Unified Building Bye-laws, 2021, municipal laws and development regulations should therefore be applied in a way that recognises the differences between locations. Some requirements particularly those relating to structural stability, fire safety, life safety and applicable environmental restrictions, must remain non-negotiable. Other controls, such as FAR and building height, may be adjusted where the Master Plan, infrastructure capacity and site conditions justify doing so. Industrial areas may reasonably require greater development flexibility, but this should not mean that essential fire access, worker safety, environmental management or emergency circulation can be compromised.
The objective should be flexibility guided by planning principles, not flexibility without limits.

 

J&K's Fragile Environment Cannot Be an Afterthought


The environmental dimension makes this debate particularly important for Jammu and Kashmir. Our towns and cities exist within a landscape shaped by rivers, lakes, wetlands, forests, mountain slopes and natural drainage systems. Development that ignores these relationships can create problems extending far beyond an individual plot. The 2014 Kashmir floods remain a powerful reminder of the consequences that flooding can have for settlements, infrastructure, livelihoods and public services. They also underline the importance of protecting natural drainage and flood-storage areas. Srinagar's relationship with the Jhelum, Dal Lake, Nigeen, Anchar, Hokersar and interconnected drainage channels illustrates why environmental protection cannot be confined to the boundaries of an individual water body. A site may appear suitable for construction but form part of a drainage pathway, wetland buffer or catchment that supports a larger ecological system. Even where permanent structures in water bodies are prohibited, development in adjoining areas may still affect runoff, water quality and flood exposure. The concerns extend beyond Srinagar. In hilly areas, slope stability, geology, drainage and seismic vulnerability must inform decisions about where and how construction takes place. Climate change adds another layer of uncertainty. Changing rainfall patterns and the possibility of more intense weather events make it increasingly important to consider future risks rather than rely entirely on historical conditions. Environmental screening should therefore be built into the approval process. Significant proposals should be assessed for flood exposure, drainage capacity, slope and seismic risks, water availability, heat exposure, wastewater management and emergency access. Development should be directed towards suitable locations, while areas that serve essential ecological or hazard-management functions should receive protection under the applicable legal framework.These safeguards are not barriers to growth. They help ensure that today's investment does not become tomorrow's public liability.

 

Why Is Ease of Living Included in the Act?

 

The Act links ease of doing business with ease of living, employment generation and economic growth. This is a welcome recognition that government procedures affect not only businesses but also ordinary citizens. People should be able to obtain legitimate building permissions without unnecessary delay. Entrepreneurs should not be subjected to arbitrary decisions. Public services should be accessible, predictable and accountable. But ease of living means much more than obtaining a building permission quickly. It means having safe buildings, affordable housing, reliable water supply, proper sanitation, accessible public transport, walkable streets, parks, clean air and protection from environmental hazards. A development may receive approval quickly yet increase congestion, overload drainage, reduce open space or expose neighbouring households to greater flood risk. In such circumstances, the investor may benefit while the wider community bears the cost. Ease of Living should be judged by the quality of life that regulation helps create, not simply by the speed with which approvals are issued.
For J&K, this means ensuring that economic development contributes to safer settlements, better public services, improved mobility and a healthier environment.

 

What Could the Act Mean for J&K's Urban Future?

 

The consequences will depend on how the Act is implemented. If the government combines digital approvals with transparent rules, competent professional certification and effective enforcement, the Act could reduce bureaucratic delays while encouraging legitimate investment. However, if land-use relaxations become routine, deemed approvals override substantive scrutiny and self-certification operates without accountability, the cumulative consequences could include incompatible land uses, infrastructure deficits, unauthorised construction and greater environmental vulnerability. These outcomes are not inevitable. They are risks that can be addressed through careful implementation. The government should evaluate success not only through the number of approvals issued or the reduction in processing time, but also through the quality of development, the number and seriousness of violations, the adequacy of infrastructure and the environmental consequences of decisions.

 

Measures Needed to Protect Planning and Public Interest

 

The Act's objectives can be achieved without weakening essential safeguards. The following measures deserve priority. First, complete Master Plan coverage. Prepare statutory Master Plans for unplanned and rapidly growing towns. Establish interim spatial controls until the plans are notified. Second, regulate land-use relaxations. Require technical assessments, infrastructure-capacity analysis and publicly accessible reasons for decisions under Section 22. Significant changes to a settlement's spatial structure should follow the applicable statutory plan-modification process. Third, adopt risk-based building permissions. Use self-certification for standard, low-risk construction; enhanced technical scrutiny for moderate-risk projects; and mandatory prior review for high-impact development and sensitive sites. Fourth, make deemed approval conditional. Ensure that it cannot override statutory prohibitions, mandatory clearances or essential safety requirements. Missed deadlines should trigger escalation and accountability. Fifth, clarify the inspection provisions. Prevent unnecessary inspections while retaining risk-based audits and timely intervention in cases involving serious threats to life, public infrastructure or the environment. Sixth, integrate GIS and climate-risk information. Connect approval systems with Master Plan land uses, water bodies, drainage networks, floodplains, hazard maps and infrastructure capacity. Seventh, strengthen professional accountability. Maintain transparent registers of certifiers, conduct independent audits and impose meaningful penalties for negligent or fraudulent certification. Eighth, protect essential building standards. Keep structural safety, fire safety and applicable environmental safeguards non-negotiable. Allow flexibility in development controls only where location and infrastructure capacity justify it. Ninth, ensure transparency. Publish relaxation orders, reasons, conditions and compliance records, subject to lawful confidentiality requirements. Provide effective grievance and appeal mechanisms. Last and Tenth, conduct independent periodic reviews. Assess whether the Act is improving legitimate investment without increasing violations, environmental damage or infrastructure deficits.


The Need for Coordinated and Digitally Enabled Planning

 

These reforms will require coordination between the Housing and Urban Development Department, development authorities, municipalities, revenue agencies, environmental regulators, the Forest Department, disaster-management authorities and infrastructure agencies. GIS-based Master Plans and automated building scrutiny can reduce discretion and improve consistency. However, technology is only as reliable as the information and rules on which it operates. J&K should develop an integrated planning and compliance system linking notified land uses, legally applicable restrictions, infrastructure capacity, hazard information, building permissions, inspections and enforcement records. Such a system should identify incompatible uses and sensitive locations before an application is processed through a simplified approval route. The government should also publish a clear explanation of how the Act interacts with the Development Act, municipal laws, the Unified Building Bye-laws, the Control of Building Operations Act and applicable environmental legislation. The precise effect of amendments and overriding provisions must be determined from the enacted text and implementing rules.


Development Must Serve People, Not Just Projects


The Jammu and Kashmir Ease of Doing Business Act, 2026, addresses a genuine problem. Unnecessary permissions, repetitive documentation and administrative delays have long frustrated citizens and entrepreneurs. Removing these barriers is both desirable and necessary. But the success of reform cannot be measured only by how quickly a certificate is issued. It must also be measured by whether development remains compatible with Master Plans, building standards, infrastructure capacity, environmental protection and public safety. The most serious concerns relate to the combined effect of deemed approvals, self-certification, relaxation of land uses, modification of development controls and restrictions on inspections. These concerns become more pressing where Master Plans are absent and ecological vulnerabilities are poorly documented. For Jammu and Kashmir, the stakes are particularly high. Our land, water, settlements and mountain ecosystems are interconnected. Poorly planned development can impose costs that extend far beyond the individual project and may burden generations to come. The answer is not to oppose investment or return to a system of endless permissions. It is to make the regulatory framework simpler, more transparent and more accountable while preserving the safeguards that protect the public interest. Ultimately, Ease of Doing Business and Ease of Living should reinforce each other. Businesses need predictable rules and efficient services; citizens need safe neighbourhoods, reliable infrastructure and a healthy environment.
The guiding principle should be simple that is remove unnecessary permissions hurdles, not necessary protections; reduce bureaucratic interference, not professional scrutiny; and accelerate lawful investment without encouraging unplanned urbanisation. That is how Jammu and Kashmir can pursue economic growth without sacrificing the livability, ecological security and long-term interests of its people..

 


Email:-------------------------- hamwani24@gmail.com

BREAKING NEWS

VIDEO

Twitter

Facebook

Ease of Doing Business Act: Growth Without Compromise-11

Let Ease of Doing Business not become Ease of Undoing Planning. Therefore, what is required is that simplifying procedures should not shirk safeguards; accelerated investments should not engender ecological destruction. J&K is a place where every plot is part of a larger urban and ecological system, the true measure of reform or enactments is not how fast we build, but how wisely we shape. A building may rise on a single plot but its consequences are witnessed by the entire area/community.

October 16, 2026 | Hammid Ahmad Wani

Building Bye-Laws, FAR and Development Control: Flexibility Has Limits

The Provisions of the Act indicate that it permits relaxation of Development Control Norms, including FAR, height, ground coverage, setbacks, parking and open space, through the prescribed mechanism. These controls are sometimes seen as rigid technical restrictions. In reality, they influence how a building relates to its surroundings and how much pressure it places on public infrastructure. An increase in FAR may be appropriate near a well-served public transport corridor with adequate water supply, sewerage and emergency access. The same increase may be unsuitable in a congested neighbourhood with narrow roads, inadequate drainage and limited open space. Similarly, reducing setbacks or increasing ground coverage may appear to be a small adjustment for one building. If repeated across a neighbourhood, however, such changes can reduce ventilation, daylight, permeable surfaces and emergency access. The Jammu and Kashmir Unified Building Bye-laws, 2021, municipal laws and development regulations should therefore be applied in a way that recognises the differences between locations. Some requirements particularly those relating to structural stability, fire safety, life safety and applicable environmental restrictions, must remain non-negotiable. Other controls, such as FAR and building height, may be adjusted where the Master Plan, infrastructure capacity and site conditions justify doing so. Industrial areas may reasonably require greater development flexibility, but this should not mean that essential fire access, worker safety, environmental management or emergency circulation can be compromised.
The objective should be flexibility guided by planning principles, not flexibility without limits.

 

J&K's Fragile Environment Cannot Be an Afterthought


The environmental dimension makes this debate particularly important for Jammu and Kashmir. Our towns and cities exist within a landscape shaped by rivers, lakes, wetlands, forests, mountain slopes and natural drainage systems. Development that ignores these relationships can create problems extending far beyond an individual plot. The 2014 Kashmir floods remain a powerful reminder of the consequences that flooding can have for settlements, infrastructure, livelihoods and public services. They also underline the importance of protecting natural drainage and flood-storage areas. Srinagar's relationship with the Jhelum, Dal Lake, Nigeen, Anchar, Hokersar and interconnected drainage channels illustrates why environmental protection cannot be confined to the boundaries of an individual water body. A site may appear suitable for construction but form part of a drainage pathway, wetland buffer or catchment that supports a larger ecological system. Even where permanent structures in water bodies are prohibited, development in adjoining areas may still affect runoff, water quality and flood exposure. The concerns extend beyond Srinagar. In hilly areas, slope stability, geology, drainage and seismic vulnerability must inform decisions about where and how construction takes place. Climate change adds another layer of uncertainty. Changing rainfall patterns and the possibility of more intense weather events make it increasingly important to consider future risks rather than rely entirely on historical conditions. Environmental screening should therefore be built into the approval process. Significant proposals should be assessed for flood exposure, drainage capacity, slope and seismic risks, water availability, heat exposure, wastewater management and emergency access. Development should be directed towards suitable locations, while areas that serve essential ecological or hazard-management functions should receive protection under the applicable legal framework.These safeguards are not barriers to growth. They help ensure that today's investment does not become tomorrow's public liability.

 

Why Is Ease of Living Included in the Act?

 

The Act links ease of doing business with ease of living, employment generation and economic growth. This is a welcome recognition that government procedures affect not only businesses but also ordinary citizens. People should be able to obtain legitimate building permissions without unnecessary delay. Entrepreneurs should not be subjected to arbitrary decisions. Public services should be accessible, predictable and accountable. But ease of living means much more than obtaining a building permission quickly. It means having safe buildings, affordable housing, reliable water supply, proper sanitation, accessible public transport, walkable streets, parks, clean air and protection from environmental hazards. A development may receive approval quickly yet increase congestion, overload drainage, reduce open space or expose neighbouring households to greater flood risk. In such circumstances, the investor may benefit while the wider community bears the cost. Ease of Living should be judged by the quality of life that regulation helps create, not simply by the speed with which approvals are issued.
For J&K, this means ensuring that economic development contributes to safer settlements, better public services, improved mobility and a healthier environment.

 

What Could the Act Mean for J&K's Urban Future?

 

The consequences will depend on how the Act is implemented. If the government combines digital approvals with transparent rules, competent professional certification and effective enforcement, the Act could reduce bureaucratic delays while encouraging legitimate investment. However, if land-use relaxations become routine, deemed approvals override substantive scrutiny and self-certification operates without accountability, the cumulative consequences could include incompatible land uses, infrastructure deficits, unauthorised construction and greater environmental vulnerability. These outcomes are not inevitable. They are risks that can be addressed through careful implementation. The government should evaluate success not only through the number of approvals issued or the reduction in processing time, but also through the quality of development, the number and seriousness of violations, the adequacy of infrastructure and the environmental consequences of decisions.

 

Measures Needed to Protect Planning and Public Interest

 

The Act's objectives can be achieved without weakening essential safeguards. The following measures deserve priority. First, complete Master Plan coverage. Prepare statutory Master Plans for unplanned and rapidly growing towns. Establish interim spatial controls until the plans are notified. Second, regulate land-use relaxations. Require technical assessments, infrastructure-capacity analysis and publicly accessible reasons for decisions under Section 22. Significant changes to a settlement's spatial structure should follow the applicable statutory plan-modification process. Third, adopt risk-based building permissions. Use self-certification for standard, low-risk construction; enhanced technical scrutiny for moderate-risk projects; and mandatory prior review for high-impact development and sensitive sites. Fourth, make deemed approval conditional. Ensure that it cannot override statutory prohibitions, mandatory clearances or essential safety requirements. Missed deadlines should trigger escalation and accountability. Fifth, clarify the inspection provisions. Prevent unnecessary inspections while retaining risk-based audits and timely intervention in cases involving serious threats to life, public infrastructure or the environment. Sixth, integrate GIS and climate-risk information. Connect approval systems with Master Plan land uses, water bodies, drainage networks, floodplains, hazard maps and infrastructure capacity. Seventh, strengthen professional accountability. Maintain transparent registers of certifiers, conduct independent audits and impose meaningful penalties for negligent or fraudulent certification. Eighth, protect essential building standards. Keep structural safety, fire safety and applicable environmental safeguards non-negotiable. Allow flexibility in development controls only where location and infrastructure capacity justify it. Ninth, ensure transparency. Publish relaxation orders, reasons, conditions and compliance records, subject to lawful confidentiality requirements. Provide effective grievance and appeal mechanisms. Last and Tenth, conduct independent periodic reviews. Assess whether the Act is improving legitimate investment without increasing violations, environmental damage or infrastructure deficits.


The Need for Coordinated and Digitally Enabled Planning

 

These reforms will require coordination between the Housing and Urban Development Department, development authorities, municipalities, revenue agencies, environmental regulators, the Forest Department, disaster-management authorities and infrastructure agencies. GIS-based Master Plans and automated building scrutiny can reduce discretion and improve consistency. However, technology is only as reliable as the information and rules on which it operates. J&K should develop an integrated planning and compliance system linking notified land uses, legally applicable restrictions, infrastructure capacity, hazard information, building permissions, inspections and enforcement records. Such a system should identify incompatible uses and sensitive locations before an application is processed through a simplified approval route. The government should also publish a clear explanation of how the Act interacts with the Development Act, municipal laws, the Unified Building Bye-laws, the Control of Building Operations Act and applicable environmental legislation. The precise effect of amendments and overriding provisions must be determined from the enacted text and implementing rules.


Development Must Serve People, Not Just Projects


The Jammu and Kashmir Ease of Doing Business Act, 2026, addresses a genuine problem. Unnecessary permissions, repetitive documentation and administrative delays have long frustrated citizens and entrepreneurs. Removing these barriers is both desirable and necessary. But the success of reform cannot be measured only by how quickly a certificate is issued. It must also be measured by whether development remains compatible with Master Plans, building standards, infrastructure capacity, environmental protection and public safety. The most serious concerns relate to the combined effect of deemed approvals, self-certification, relaxation of land uses, modification of development controls and restrictions on inspections. These concerns become more pressing where Master Plans are absent and ecological vulnerabilities are poorly documented. For Jammu and Kashmir, the stakes are particularly high. Our land, water, settlements and mountain ecosystems are interconnected. Poorly planned development can impose costs that extend far beyond the individual project and may burden generations to come. The answer is not to oppose investment or return to a system of endless permissions. It is to make the regulatory framework simpler, more transparent and more accountable while preserving the safeguards that protect the public interest. Ultimately, Ease of Doing Business and Ease of Living should reinforce each other. Businesses need predictable rules and efficient services; citizens need safe neighbourhoods, reliable infrastructure and a healthy environment.
The guiding principle should be simple that is remove unnecessary permissions hurdles, not necessary protections; reduce bureaucratic interference, not professional scrutiny; and accelerate lawful investment without encouraging unplanned urbanisation. That is how Jammu and Kashmir can pursue economic growth without sacrificing the livability, ecological security and long-term interests of its people..

 


Email:-------------------------- hamwani24@gmail.com


  • Address: R.C 2 Quarters Press Enclave Near Pratap Park, Srinagar 190001.
  • Phone: 0194-2451076 , +91-941-940-0056 , +91-962-292-4716
  • Email: brighterkmr@gmail.com
Owner, Printer, Publisher, Editor: Farooq Ahmad Wani
Legal Advisor: M.J. Hubi
Printed at: Sangermal offset Printing Press Rangreth ( Budgam)
Published from: Gulshanabad Chraresharief Budgam
RNI No.: JKENG/2010/33802
Office No’s: 0194-2451076
Mobile No’s 9419400056, 9622924716 ,7006086442
Postal Regd No: SK/135/2010-2019
POST BOX NO: 1001
Administrative Office: R.C 2 Quarters Press Enclave Near Pratap Park ( Srinagar -190001)

© Copyright 2023 brighterkashmir.com All Rights Reserved. Quantum Technologies

Owner, Printer, Publisher, Editor: Farooq Ahmad Wani
Legal Advisor: M.J. Hubi
Printed at: Abid Enterprizes, Zainkote Srinagar
Published from: Gulshanabad Chraresharief Budgam
RNI No.: JKENG/2010/33802
Office No’s: 0194-2451076, 9622924716 , 9419400056
Postal Regd No: SK/135/2010-2019
Administrative Office: Abi Guzer Srinagar

© Copyright 2018 brighterkashmir.com All Rights Reserved.