12-26-2024     3 رجب 1440

Railway Board Chairman carries out inspection of USBRL project

February 11, 2024 | BK NEWS SERVICE

Jaya Varma Sinha, Chairman & Chief Executive Officer, Railway Board has carried out an intensive inspection of the USBRL project . Shobhan Chaudhuri, General Manager/Northern Railway, Sandeep Gupta, CAO/USBRL, Sanjay Gupta, CMD/KRCL, V P Singh, PCE/NR, Shri U. C. Joshi, PCOM/NR & Sanjay Sahu, Divisional Railway Manager/Firozpur and other senior officers of USBRL Project were present during the inspection.

Jaya Varma Sinha commenced his inspection from Katra to Tunnel No. T-33 (old T-1). She conducted Motor Trolly inspection, followed by an intensive on foot inspection of ongoing critical work of Tunnel T-33. She appreciated the good work being done by the project team under the extremely challenging geological conditions and advised them to follow all safety protocols. She directed the project authorities to take all possible measures to expedite the completion of balance works so that Katra-Reasi section can be linked.
She continued the motor trolley inspection Tunnel T-34(old T-2) onwards through Anji Bridge, Reasi Station, Bakkal Station, Chenab Bridge right up to Dugga railway station inspecting track, E&M, S&T and RE works and expressed satisfaction regarding the quality and progress of these works.
CRB reviewed the progress of the USBRL project at Chenab Bridge site with the officials of NR, KRCL & IRCON. She expressed satisfaction at the pace of works and directed the project authorities to closely monitor all balance works especially Tunnel T-1 & Sawalkote yard works to ensure that there are no delays.
In spite of all types of geological, topographical and meteorological challenges, work on the remaining portion is in full swing. Every day, Indian Railway is edging

Railway Board Chairman carries out inspection of USBRL project

February 11, 2024 | BK NEWS SERVICE

Jaya Varma Sinha, Chairman & Chief Executive Officer, Railway Board has carried out an intensive inspection of the USBRL project . Shobhan Chaudhuri, General Manager/Northern Railway, Sandeep Gupta, CAO/USBRL, Sanjay Gupta, CMD/KRCL, V P Singh, PCE/NR, Shri U. C. Joshi, PCOM/NR & Sanjay Sahu, Divisional Railway Manager/Firozpur and other senior officers of USBRL Project were present during the inspection.

Jaya Varma Sinha commenced his inspection from Katra to Tunnel No. T-33 (old T-1). She conducted Motor Trolly inspection, followed by an intensive on foot inspection of ongoing critical work of Tunnel T-33. She appreciated the good work being done by the project team under the extremely challenging geological conditions and advised them to follow all safety protocols. She directed the project authorities to take all possible measures to expedite the completion of balance works so that Katra-Reasi section can be linked.
She continued the motor trolley inspection Tunnel T-34(old T-2) onwards through Anji Bridge, Reasi Station, Bakkal Station, Chenab Bridge right up to Dugga railway station inspecting track, E&M, S&T and RE works and expressed satisfaction regarding the quality and progress of these works.
CRB reviewed the progress of the USBRL project at Chenab Bridge site with the officials of NR, KRCL & IRCON. She expressed satisfaction at the pace of works and directed the project authorities to closely monitor all balance works especially Tunnel T-1 & Sawalkote yard works to ensure that there are no delays.
In spite of all types of geological, topographical and meteorological challenges, work on the remaining portion is in full swing. Every day, Indian Railway is edging


  • Address: R.C 2 Quarters Press Enclave Near Pratap Park, Srinagar 190001.
  • Phone: 0194-2451076 , +91-941-940-0056 , +91-962-292-4716
  • Email: brighterkmr@gmail.com
Owner, Printer, Publisher, Editor: Farooq Ahmad Wani
Legal Advisor: M.J. Hubi
Printed at: Sangermal offset Printing Press Rangreth ( Budgam)
Published from: Gulshanabad Chraresharief Budgam
RNI No.: JKENG/2010/33802
Office No’s: 0194-2451076
Mobile No’s 9419400056, 9622924716 ,7006086442
Postal Regd No: SK/135/2010-2019
POST BOX NO: 1001
Administrative Office: R.C 2 Quarters Press Enclave Near Pratap Park ( Srinagar -190001)

© Copyright 2023 brighterkashmir.com All Rights Reserved. Quantum Technologies

Owner, Printer, Publisher, Editor: Farooq Ahmad Wani
Legal Advisor: M.J. Hubi
Printed at: Abid Enterprizes, Zainkote Srinagar
Published from: Gulshanabad Chraresharief Budgam
RNI No.: JKENG/2010/33802
Office No’s: 0194-2451076, 9622924716 , 9419400056
Postal Regd No: SK/135/2010-2019
Administrative Office: Abi Guzer Srinagar

© Copyright 2018 brighterkashmir.com All Rights Reserved.