BREAKING NEWS

10-06-2025     3 رجب 1440

Dy CM lays foundation stones for three key bridges in Nowshera

October 03, 2025 | BK News Service

Nowshera, Oct 2: Deputy Chief Minister, Surinder Choudhary today laid the foundation stones for three vital bridge projects aimed at strengthening road connectivity in the Nowshera area.

He laid the foundation stone for the construction of a 50-meter span motorable bridge with footpath over Androoth Nallah at Village Androoth under NABARD, with an estimated cost of Rs. 292 lakh.
He also laid the foundation stone for the 28-meter span motorable bridge at Rattan Galla Kalsian, including approaches, with an estimated cost of Rs. 284 lakh.
Another major project for which the foundation was laid is a 50-meter span motorable bridge with footpath over Androoth Nallah at Village Androoth, with an estimated cost of Rs. 400 lakh.
During his visit, the Deputy Chief Minister also held a Public Darbar at Kalsian, where he interacted with the people and listened to their issues and demands. The Deputy CM redressed several grievances on the spot.
The general public expressed gratitude to the Deputy Chief Minister for sanctioning and laying the foundation of these important bridges, which will greatly benefit the local population by improving connectivity and easing transportation.
SE Tilak Raj; Executive Engineer PWD Nowshera Sarwar Mehmood; besides other district and sectoral officers also accompanied the Deputy CM during the visit.

BREAKING NEWS

VIDEO

Twitter

Facebook

Dy CM lays foundation stones for three key bridges in Nowshera

October 03, 2025 | BK News Service

Nowshera, Oct 2: Deputy Chief Minister, Surinder Choudhary today laid the foundation stones for three vital bridge projects aimed at strengthening road connectivity in the Nowshera area.

He laid the foundation stone for the construction of a 50-meter span motorable bridge with footpath over Androoth Nallah at Village Androoth under NABARD, with an estimated cost of Rs. 292 lakh.
He also laid the foundation stone for the 28-meter span motorable bridge at Rattan Galla Kalsian, including approaches, with an estimated cost of Rs. 284 lakh.
Another major project for which the foundation was laid is a 50-meter span motorable bridge with footpath over Androoth Nallah at Village Androoth, with an estimated cost of Rs. 400 lakh.
During his visit, the Deputy Chief Minister also held a Public Darbar at Kalsian, where he interacted with the people and listened to their issues and demands. The Deputy CM redressed several grievances on the spot.
The general public expressed gratitude to the Deputy Chief Minister for sanctioning and laying the foundation of these important bridges, which will greatly benefit the local population by improving connectivity and easing transportation.
SE Tilak Raj; Executive Engineer PWD Nowshera Sarwar Mehmood; besides other district and sectoral officers also accompanied the Deputy CM during the visit.


  • Address: R.C 2 Quarters Press Enclave Near Pratap Park, Srinagar 190001.
  • Phone: 0194-2451076 , +91-941-940-0056 , +91-962-292-4716
  • Email: brighterkmr@gmail.com
Owner, Printer, Publisher, Editor: Farooq Ahmad Wani
Legal Advisor: M.J. Hubi
Printed at: Sangermal offset Printing Press Rangreth ( Budgam)
Published from: Gulshanabad Chraresharief Budgam
RNI No.: JKENG/2010/33802
Office No’s: 0194-2451076
Mobile No’s 9419400056, 9622924716 ,7006086442
Postal Regd No: SK/135/2010-2019
POST BOX NO: 1001
Administrative Office: R.C 2 Quarters Press Enclave Near Pratap Park ( Srinagar -190001)

© Copyright 2023 brighterkashmir.com All Rights Reserved. Quantum Technologies

Owner, Printer, Publisher, Editor: Farooq Ahmad Wani
Legal Advisor: M.J. Hubi
Printed at: Abid Enterprizes, Zainkote Srinagar
Published from: Gulshanabad Chraresharief Budgam
RNI No.: JKENG/2010/33802
Office No’s: 0194-2451076, 9622924716 , 9419400056
Postal Regd No: SK/135/2010-2019
Administrative Office: Abi Guzer Srinagar

© Copyright 2018 brighterkashmir.com All Rights Reserved.