11-19-2024     3 رجب 1440

KPDCL hits 1 MW solar capacity

November 19, 2024 |

In a significant milestone for renewable energy adoption in Kashmir Division, Kashmir Power Distribution Corporation Limited (KPDCL) has successfully achieved 1 MW of rooftop solar capacity under the flagship PM Surya Ghar: Muft Bijli Yojana.

This achievement, coupled with disbursement of ₹1.00 Cr in Central subsidy to 110 domestic beneficiaries, marks a major boost in making solar energy affordable and accessible to the consumers.

A KPDCL spokesperson today underscored the significance of these subsidies in empowering consumers to navigate towards solar energy, reducing their dependence on conventional power sources. Additionally, the spokesperson announced that Rs 1 crore in UT subsidy has been allocated to KPDCL which shall enable disbursement of an additional subsidy of Rs.9,000 per eligible beneficiary for solar plants up to 3 kWp capacity. “Beneficiaries who have already received Central subsidies up to Rs.85,800/- for plants up to 3 kWp will soon receive the UT subsidy directly into their accounts, ensuring a seamless process under the National PM Surya Ghar Portal,” he said, adding the subsidies were credited directly into beneficiaries' accounts within a week of commissioning their solar plants by KPDCL’s technical teams.

The Ministry of New & Renewable Energy (MN&RE) has also redeemed subsidies for 93 additional beneficiaries, with their disbursements expected shortly through Direct Benefit Transfer (DBT). These timely efforts highlight KPDCL’s dedication to accelerate renewable energy adoption and ensuring maximum benefits reach the consumers efficiently.

Exuding confidence, the KPDCL spokesperson stated that the scheme has generated wide consumer interest, with 249 rooftops already equipped with solar installations, achieving a total capacity of 1 MW. On an average, households have opted for larger systems, typically around 4 kWp, maximizing the financial and environmental benefits of solar energy. “1407 consumers have finalized agreements with empanelled vendors and are progressing through procurement and installation phases, highlighting the growing acceptance and adoption of the scheme,” he added

KPDCL is preparing for the release of the next round of Central subsidies worth Rs. 79.00 lakh for 93 beneficiaries, whose claims are already processed. “With over 1200 installations currently underway, KPDCL is poised to achieve its target of 3.5 MW installed capacity within the next two months,” he added.

KPDCL hits 1 MW solar capacity

November 19, 2024 |

In a significant milestone for renewable energy adoption in Kashmir Division, Kashmir Power Distribution Corporation Limited (KPDCL) has successfully achieved 1 MW of rooftop solar capacity under the flagship PM Surya Ghar: Muft Bijli Yojana.

This achievement, coupled with disbursement of ₹1.00 Cr in Central subsidy to 110 domestic beneficiaries, marks a major boost in making solar energy affordable and accessible to the consumers.

A KPDCL spokesperson today underscored the significance of these subsidies in empowering consumers to navigate towards solar energy, reducing their dependence on conventional power sources. Additionally, the spokesperson announced that Rs 1 crore in UT subsidy has been allocated to KPDCL which shall enable disbursement of an additional subsidy of Rs.9,000 per eligible beneficiary for solar plants up to 3 kWp capacity. “Beneficiaries who have already received Central subsidies up to Rs.85,800/- for plants up to 3 kWp will soon receive the UT subsidy directly into their accounts, ensuring a seamless process under the National PM Surya Ghar Portal,” he said, adding the subsidies were credited directly into beneficiaries' accounts within a week of commissioning their solar plants by KPDCL’s technical teams.

The Ministry of New & Renewable Energy (MN&RE) has also redeemed subsidies for 93 additional beneficiaries, with their disbursements expected shortly through Direct Benefit Transfer (DBT). These timely efforts highlight KPDCL’s dedication to accelerate renewable energy adoption and ensuring maximum benefits reach the consumers efficiently.

Exuding confidence, the KPDCL spokesperson stated that the scheme has generated wide consumer interest, with 249 rooftops already equipped with solar installations, achieving a total capacity of 1 MW. On an average, households have opted for larger systems, typically around 4 kWp, maximizing the financial and environmental benefits of solar energy. “1407 consumers have finalized agreements with empanelled vendors and are progressing through procurement and installation phases, highlighting the growing acceptance and adoption of the scheme,” he added

KPDCL is preparing for the release of the next round of Central subsidies worth Rs. 79.00 lakh for 93 beneficiaries, whose claims are already processed. “With over 1200 installations currently underway, KPDCL is poised to achieve its target of 3.5 MW installed capacity within the next two months,” he added.


  • Address: R.C 2 Quarters Press Enclave Near Pratap Park, Srinagar 190001.
  • Phone: 0194-2451076 , +91-941-940-0056 , +91-962-292-4716
  • Email: brighterkmr@gmail.com
Owner, Printer, Publisher, Editor: Farooq Ahmad Wani
Legal Advisor: M.J. Hubi
Printed at: Sangermal offset Printing Press Rangreth ( Budgam)
Published from: Gulshanabad Chraresharief Budgam
RNI No.: JKENG/2010/33802
Office No’s: 0194-2451076
Mobile No’s 9419400056, 9622924716 ,7006086442
Postal Regd No: SK/135/2010-2019
POST BOX NO: 1001
Administrative Office: R.C 2 Quarters Press Enclave Near Pratap Park ( Srinagar -190001)

© Copyright 2023 brighterkashmir.com All Rights Reserved. Quantum Technologies

Owner, Printer, Publisher, Editor: Farooq Ahmad Wani
Legal Advisor: M.J. Hubi
Printed at: Abid Enterprizes, Zainkote Srinagar
Published from: Gulshanabad Chraresharief Budgam
RNI No.: JKENG/2010/33802
Office No’s: 0194-2451076, 9622924716 , 9419400056
Postal Regd No: SK/135/2010-2019
Administrative Office: Abi Guzer Srinagar

© Copyright 2018 brighterkashmir.com All Rights Reserved.